Project Portfolio
A selection of civil engineering and land development projects representing our experience across multiple sectors and project types.

Retail Center Site Development
Complete civil engineering for a 12-acre retail center including site grading, stormwater detention, utility design, and full permitting coordination.
Challenge Solved
The site contained a significant elevation change requiring creative grading to minimize earthwork costs while achieving positive drainage throughout.

Subdivision Infrastructure Design
Full subdivision design for a 45-lot residential community including street layout, utility extensions, stormwater system, and plat preparation.
Challenge Solved
Coordination with multiple utility providers and the county highway department required careful phasing to achieve approvals within the developer's timeline.

Distribution Center Site Engineering
Site development engineering for a 200,000 SF distribution facility including truck court grading, stormwater management, and utility coordination.
Challenge Solved
The tight development schedule required accelerated design and permitting, with construction phasing to allow early earthwork while design was finalized.

Street Improvement Project
Design and construction document preparation for 0.8 miles of street reconstruction including pavement, curb and gutter, drainage, and utility adjustments.
Challenge Solved
Existing underground utilities required extensive research and field verification to avoid conflicts with the new street design.

Regional Detention Basin
Design of a regional stormwater detention facility serving multiple developments, providing flood control and water quality improvement.
Challenge Solved
Balancing storage volume requirements with land constraints required careful optimization of basin geometry and outlet structure design.

Commercial Property Redevelopment
Engineering services for the redevelopment of a former industrial site including drainage analysis, grading redesign, and utility upgrades.
Challenge Solved
Existing infrastructure in poor condition required a phased replacement approach that allowed continued site operations during construction.